Weekly Activities
For the week of February 29, 2016, National Grid’s contractor will begin to re-mobilize to the site to continue the remedial construction in the bulkhead area. This will include re-exposing the barrier wall so the sheet joints can be cleared and grouted. Mobilization associated with the coring into the top of the tunnel that runs perpendicular to Beach Channel Drive. The coring will put holes into the top so that grout can be pumped into the tunnel.