Weekly Update: December 14, 2009 - December 18, 2009
photo
Center Tent Panel being reinstalled at Tent Position 8

National Grid’s Remediation Contractor continued with site remediation activities, which included the delivery of construction materials, imported backfill material (stone and common fill), and construction equipment and supplies.  Tent Position # 7 was relocated southwest to Tent Position # 8; where tent relocation activities included the temporary disassembly and staging of tent anchors and the vapor management system (VMS), temporary removal of the central panel, end panels and access doors, followed by the relocation of the two tent sections and replacement of the central panel, access doors, and weather damaged side and end panels.  Installation of temporary sheet piles continued at planned tent positions along the northern perimeter of the Site.   National Grid’s consulting engineer conducted noise and vibration monitoring activities, as necessary.

 

photo
Tent being moved from Position 7 to Position 8.

Maintenance of the decontamination areas, work zones, on-site gravel access roads, parking areas and material staging areas, the imported backfill material (i.e., clean fill) stockpile covers, the perimeter privacy screen, and soil erosion and sediment control (SESC) measures continued. Odor and dust suppression activities were conducted, as necessary. National Grid’s consulting engineers continued to monitor the site activities with the fixed base community air monitoring program (CAMP) equipment, as well as with noise and vibration monitors.

During the period from December 14, 2009 through December 20, 2009, six fixed base CAMP units and one portable CAMP unit were in-use and measured total volatile organic compounds (TVOC) and particulates (PM10). Fifteen-minute averages for both TVOC and PM10 data remained in the Operational Condition. Elevated PM10 measurements were reported on December 17, 2009 and December 19, 2009; where these PM10 measurements were not associated with ground intrusive activities. Weekly Reports of the CAMP data can be found as a separate tab in the Weekly Report Archive section.

For the holiday week of December 21, 2009 through December 24, 2009, Tent Position #8 VMS and new door way improvements will be completed. Tent Position # 8 Shallow Excavation activities are scheduled to commence. Further, the delivery of imported clean backfill material (stone and common fill) and backfill material placement inside Tent Position #8 are scheduled to commence.  On-site concrete demolition, crushing, and reuse operations are scheduled to continue at the Site, as necessary. Installation of temporary sheet piles will continue at planned tent positions along the northern perimeter of the Site.  Odor and dust suppression activities will be conducted as necessary. Work zone delineation, site maintenance activities, CAMP operation, and noise and vibration monitoring activities will continue.